Damaged WallFollowing vehicular impact damage at an industrial estate in Ipswich, we removed loose brickwork and exposed to a sound base course. ...
Fire DamageFollowing a fire within a residents room at a home in Woking, we cleared the room entirely. Floor coverings replaced, walls, ceilings...
Waste ClearanceFollowing an end of tenancy and the unit remaining expectedly vacant for the foreseeable, we cleared all public facing areas and...
Retrofitted Pull HandlesFollowing reports of difficulty closing and locking newly fitted doors at a recently refurbished commercial premises in Watford, we...
Protective BollardsFollowing numerous reports of impact damage to light columns throughout a vast industrial estate in West London, we supplied and fitted...
External RedecsCarried out various tasks at a retail park in St Albans, works included bollard, light column and lamp post protector redecorations. All...
BollardFollowing reports of vehicles driving over the kerb island at a retail park in Crawley, we attended initially to make safe with barriers....
Security Hut RedecsFollowing years of neglect, the welfare facilities on this retail park in Watford underwent some well needed TLC. Walls, ceiling and...
Doorset ReplacementsAfter an inspection carried out by others, we were instructed to replace 4No doorsets within an office building nearby Holborn, London. ...
Terrace WorksFollowing an end of tenancy at a commercial office premises in Hammersmith, we prepared and made good the terrace wall. Followed by...
WC RefurbComplete strip out of a WC in Woking, Surrey. Sanitary ware replaced, vinyl flooring replaced, skirting boards replaced and...
Pavement LightFollowing reports of a leak into the basement below, we came across an aged coal chute. Upon inspection, we noted clear sealant had been...
Faded Nosing'sSecured various loose paving steps, ensuring level. Swept clear stairway and prepared surfaces. Applied yellow anti-slip floor paint...
Walkway ResurfacingExisting tarmacadam pathway broken out and spoils removed from site. Cut and removed rising tree routes, ensuring level subbase. ...
Graffiti RemovalVandalism removed from brickwork and electrical box. Oil based white paint applied to site perimeter wall in areas of graffiti. ...
Bollard LightsUpon inspection, both bollard lights were non functional due to water damage and 1of2 had been impact damaged. Internal components...
Canopy Burgess TilesInstated barriers to create a safe working environment against local foot traffic. Removed 17No damaged burgess tiles via scissor lift...
Double Doorset & Slave Leaf Due to a lack of maintenance and high footfall, the existing double doors were aged and non-compliant. Existing doors and frame removed,...
Marble Front Entrance StepsCarefully relocated existing planters and set aside for reuse. Removed existing aged marble and sustainably disposed of same, off site. ...
High-Level Mastic RepairsRaked out and removed failed mastic to existing capping. Debris bagged and removed from site. Applied grey weatherproof mastic, as...