Groundworks

Tarmac: Saw cut section of defective road surface square and remove spoils, disposing of same off site. Supply and lay 40mm in thickness of AC10 Close Surf, well rolled and consolidated. Allow to cure and remove barriers, reopening roadway. Not allowed for any line marking.

Drainage: Cut concrete / tarmac surrounds square and break out. Remove 4 channels and gratings, disposing of same off site. Bag, remove and dispose of spoils, offsite. Supply and fit 4 closely matching channels, complete with new gratings; all of which to be of the same vehicle loading. Backfill, ensuring level to existing gratings.

Contact Us
Paddon House, 12 Stortford Road, Great Dunmow, CM6 1DA
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram