Carefully remove local paviours to manhole, setting aside for reuse. Inspect manhole frame and surrounds, ensuring adequate to stay as is. Relay existing paviours, ensuring flush with manhole. Repoint the local area on completion with kiln dried sand. Carefully remove existing raised kerb and set aside for reuse. Inspect subbase and remove spoils, as required. Relay existing kerb stone, ensuring flush with neighbouring kerbs. Repoint in position with cement.