Removed the existing Velcro tape, disposing of same off site. Supplied and laid suitable floor protection, complete with 'Wet Paint' signage. Prepared reception desk top, face and sides. Applied two coats of specified paint and allowed to dry. Barriers and signage left in situ to allow for drying times. Area left tidy and secure.