Due to a lack of maintenance and high footfall, the existing double doors were aged and
non-compliant. Existing doors and frame removed, disposing of same off site. Structural opening prepared, new timber FD60 double doorset supplied and fitted. Finishes fitted and local area made good.
Following impact damage at low-level and third party auditor findings, the existing was removed and replaced with a closely matching FD30 veneered slave leaf.